method statement offshore top sell piping

Golden Weld

Apr 21, 2007· method statement generated and approved by the Client to spell out the process for completing such welds I have in the past been involved with the witnessing of such welds and it is usually up to the Welding Engineer to decide on what length to go with these joints, in the past I have had to follow a whole...

Know More

Deluge Water Spray System

An automated water spray system where the water distribution piping is equipped with open spray nozzles for discharging over a protection area or equipment Deluge water Spray systems designed according to NFPA 15, API 2030, IP 19 guidelines and local regulations...

Know More

Oil and Gas Pipeline Construction: Step

Step 4: Pipe Transport, Stringing, & Assembly When the trench is completed, pre-coated segments of pipe, usually 40 ft in length, are transported from stockpiles in the staging area to the right-of-way Pipes are laid above ground beside the trench, or within the trench on top of ,...

Know More

Procedure & Methods of Earthing

Methods of Earthing There are several methods of earthing like wire or strip earthing, rod earthing, pipe earthing, plate earthing or earthing through water mains Most commonly used methods of earthing are pipe earthing and plate earthing These methods are explained below in details...

Know More

Aditya Fariz Permana

>Understanding Piping Stress Analysis Work Instruction for Topside >Prepare Critical Line list Document, >Review piping isometric drawings,support drawings,method statements and Stress calculation for IFR document from technip >Calculate, Analysis, Prepare document and report for ,...

Know More

Cathodic protection

Cathodic protection (CP) is a technique used to control the corrosion of a metal surface by making it the cathode of an electrochemical cell A simple method of protection connects the metal to be protected to a more easily corroded "sacial metal" to act as the anodeThe sacial metal then corrodes instead of the protected metal...

Know More

PIPING AND EQUIPMENT INSULATION

Piping and equipment insulation R-004 Rev 2, June 1999 NORSOK standard 2 of 26 FOREWORD NORSOK (The competitive standing of the Norwegian offshore sector) is the industry initiative to add value, reduce cost and lead time and eliminate unnecessary activities in offshore ,...

Know More

conductor pipe

Conductor pipe is run because the shallow section of most wells onshore is drilled in unconsolidated sediment or soil rather than consolidated strata typically encountered deeper Offshore, the drive pipe or structural casing may be installed prior to the conductor for similar reasons...

Know More

Conductor Pipe Hammers

Conductor Pipe can be installed either by driving with a pile hammer or by pre-drilling a hole and cementing Conductor Pipes Pile Hammers Diesel pile hammers are used for surface driving operations on conductor pipe The driving depth of the conductor pipe is a function of the sediments in the ground...

Know More

conductor pipe

The casing string that is usually put into the well first, particularly on land wells, to prevent the sides of the hole from caving into the wellbore This casing, sometimes called drive pipe, is generally a short length and is sometimes driven into the ground Conductor pipe is run because the shallow section of most wells onshore is drilled in unconsolidated sediment or soil rather than ....

Know More

Methods of Installing Pile Foundations

Drop Hammer Method of Pile Driving A hammer with approximately the weight of the pile is raised a suitable height in a guide and released to strike the pile head This is a simple form of hammer used in conjunction with light frames and test piling, where it may be uneconomical to bring a steam boiler or compressor on to a site to drive very ....

Know More

Fire water piping

Apr 30, 2008· This standard now specifically includes cement mortar lined ductile iron piping to AWWA standards, steel and concrete pipe to AWWA standards, polyethylene pipe to AWWA C906 standard, pvc pipe to AWWA C900 standard, as well as copper pipe With regard to steel piping, the standard now includes the specific statement, "1012 Steel Pipe...

Know More

Chapter 10

Chapter 10 Marine Installations 362 5 Preparing the land-to-water transition zone and, when required, the underwater bedding 6 Assembly of the individual lengths of pipe into a continuous string of pipe 7 Mounting of the ballast weights (This step may be done in conjunction with the next step) 8 Launching the joined pipe into the water 9...

Know More

Submarine pipeline

A submarine pipeline (also known as marine, subsea or offshore pipeline) is a pipeline that is laid on the seabed or below it inside a trench In some cases, the pipeline is mostly on-land but in places it crosses water expanses, such as small seas, straits and rivers Submarine pipelines are used primarily to carry oil or gas, but transportation of water is also important...

Know More

Pipe Fittings & Joints

We are the manufacturer and supplier of pipe fittings & joints, joints for grp pipes, joints for gre pipes, grp pipe joints, gre pipe joints, equal tee, elbow, scaur valve tee, air valve tee, flanges, reducers, tail piece at Epp Composites Pvt Ltd...

Know More